Street Resurfacing Plan

road work signEvery year, Hampton's Street Division develops a schedule for resurfacing/repaving city streets based on several factors, including:

  • Cracking and other problems related to traffic loads on the street
  • Cracking and other problems related to the effects of the environment on the street
  • The roughness or smoothness of the street

Not All Streets Are the Same

Some streets get more traffic and need to be repaved more often. Other streets are less traveled and may not need to be repaved as often. By looking at their condition over a period of time using sophisticated measuring equipment and in-person visits, city engineers determine which streets need to be repaved first.

Repaving Schedule

Here is the list of streets that are scheduled to be repaved in fiscal year 2017 - July 1, 2016- June 30, 2017:

Repaving schedule for 2017

Neighborhood Districts Map

Report a Problem

If your street is not on the schedule, it probably doesn’t need to be repaved yet. But if you want to report a problem or suggest a street that you think needs attention, contact the Customer Call Center at 311 from your home phone or 757-727-8311 from a cell phone or from outside the city.